How Important Is It To Confirm That The Control System Is Functioning Correctly For Cold-pressed Needle Crimping Equipment?
Publish Time: Author: Site Editor Visit: 0
Before operating contact crimper, it is necessary to confirm that the control system is normal, because the state of the control system directly affects the mechanical response and mechanical displacement feedback of the d sub contact crimper crimping process. When the internal monitoring circuit, servo drive module or sensor is not in normal working condition, contact crimping tool it may not be able to correctly complete the set stroke or apply the design force.





