News

How To Handle And Install Cold Pressing Needles

Publish Time: Author: Site Editor Visit: 6

There are some particularities in the treatment of insulating sleeves. The length of the heat shrink tube should cover both ends of the crimping part by 5 mm, and use a hot air gun to heat evenly from the middle to both ends. If there is no hot air gun, use a lighter to shake it quickly to bake, and be careful not to burn it. For crimp contact with its own insulation layer, make sure that the insulation sleeve completely covers the metal part crimp contact pin after crimping.
When contact socket crimp is installed on the equipment, the screws must be fixed with spring washers to prevent loosening. When connecting multiple strands of wire, crimp each wire separately crimp contact female, and multiple crimp contact male are prohibited from being stacked. When using crimp socket contact in a humid environment, apply conductive paste to prevent female crimp contact oxidation, and use silver-plated male crimp contact in high-temperature places.

How To Handle And Install Cold Pressing Needles

Recent News
Recommended Products

This site uses cookies

We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.