Application Characteristics And Installation Instructions Of Glue-filled Underground Cable Waterproof Ukk Junction Box
The waterproofing of the glue-filled buried cable power terminal block is mainly used for the protection of the connection points of wires and cables, communication cables and signal cables.
4 pole distribution block belongs to solidified protection, and no water or air will come into contact with the cable connection points, so it can be buried directly underground. The glue-filled buried cable din rail distribution block has the characteristics of waterproof and moisture-proof, explosion-proof, spark-proof, acid-resistant, alkali-resistant, beautiful appearance, stable quality, complete insulation and non-conductive, impact-resistant and non-deformable. It is widely used in power supply, communication, municipal administration, water conservancy, garden landscape, street lights, tunnels and other fields. The buried glue-filled cable joint has been successfully used abroad for more than 20 years and is also being used in large quantities in my country.
The waterproof box of the glue-filled buried cable power distribution block 600v has the following characteristics:
1. It is suitable for all low-voltage power cables, communication cables and signal cables.
2. It adopts advanced resin casting technology, which is safe, simple and fast.
3. Advanced cable branch joints save space and cables.
4. Excellent waterproof insulation effect and excellent mechanical protection.
Installation instructions:
1. Strip the outer sheath of the cable where it needs to be connected, and the length should be less than power distribution terminal block;
2. Choose a connection method, branch or docking, it is recommended to use Shanghai Kang HK insulation piercing wire clamp;
3. Wrap the sponge strip around the two ends of the cable connection and close distribution terminal block;
4. Mix the resin glue of group A and B in a certain proportion, stir evenly and pour into din rail power distribution, and the installation is completed;
5. The curing speed of the resin is related to the temperature. The higher the temperature, the faster the curing. It takes about one hour at room temperature;
Be sure to pay attention to the following matters during the use and infusion of filling resin:
1. Be sure to fully and evenly mix the resin A and B materials.
2. Pour the prepared resin into the branch din rail power distribution block immediately. If you delay too long, the resin will easily thicken or even solidify.
3. It is best to wear gloves during installation.
4. The construction site should maintain good ventilation conditions.
5. Avoid direct contact between skin and eyes and resin. If it accidentally enters the eyes, please rinse with plenty of water and seek medical treatment.
6. Place the unfilled resin in a ventilated and cool place. Do not expose the resin to the sun or put it together with other blood-activating products.
7. After filling, throw all the garbage into the trash can.